When a Jersey Shore restaurant needs a permanent addition, the drawings have to work with what is already there — and with the town. At The Ravioli House in Wildwood, Dauntless Design Collaborative prepared the permit and construction drawings for an ~360-square-foot prefabricated restroom addition, coordinated how that new structure would connect to the existing dining and bar enclosure, along with the building’s existing mechanical, electrical, and plumbing systems.
The Challenge
The town had allowed temporary restroom trailers at The Ravioli House the previous summer after the enlcosure for the bar and dining area was completed. They then required permanent restrooms, adjacent to the enclosed bar and dining area, to supplement the building’s other restrooms.
The contractor, SRA Home Products, had already built the dining and bar enclosure, and the restroom addition would be a prefabricated structure that matches the enclosure. SRA could provide shop and structural drawings, but needed an architect for full permit and construction drawings.
One tricky part was coordinating with SRA how the two prefab structures would connect to each other. Prefab structures usually don't allow for custom connections. Luckily there was a way to connect both structures together using a method from the manufacturer.
Another was coordinating with the existing mechanical, electrical, and plumbing systems. The restaurant has been around for 50 years, so there have been many cheanges and renovations during those years. That meant finding electrical panels with enough space to support the new electrical load — there wasn’t much room — and identifying where the plumbing could go, including the right sewer connection to the street. Because this is a corner property, there were two options.
The prefab restroom addition, attached beside the glass dining and bar enclosure.
Our Role
SRA Home Products brought Dauntless in. We documented existing conditions first with a Matterport 3D scan, then prepared the full permit and construction drawings the project needed.
We coordinated with SRA on the connection between the two prefab structures. They connected using a solution from SRA.
Working with our MEP Engineer, GNP Design Group, we also coordinated with the existing mechanical, electrical, and plumbing systems: finding electrical panels with enough space to support the new load, and identifying where the plumbing could go. Of the two sewer options on the corner property, a nearby connection took the line to the street.
Existing conditions from the Matterport scan, and the completed enclosure.
The Design
The addition sits next to the enclosed bar and dining area. It is about 360 square feet.
Men’s and women’s restrooms each have one accessible stall, with wheelchair turning clearance and sink clearances.
Gallery
Project facts
| Client | The Ravioli House |
| Contractor | SRA Home Products |
| Location | Wildwood, NJ |
| Size | 360 sf restroom addition |
| Timeline | Design started fall 2025; construction completed summer 2026 |
| Services | Existing-conditions documentation (Matterport scan); permit and construction drawings; coordination with the prefab contractor on connecting the two structures; MEP coordination |